Register Login


ATOZ SOFT Technologies!! Call:+91-9742961188

ATOZ SOFT Technologies!! Call:+91-9742961188 , Bangalore

Indira nagar, 7th cross,bangalore Bangalore
Karnataka India(IN)560038

560038
: 9742777588 ,9962291197
: Institute

Write a Review Claim Your Ownership

INFO

SAP Online/Class Room Training in India (Call +91-9742777588),

We are a corporate consultant providing SAP Training to End User, Power User, Super User, Domain Expert and who ever wants to get a job in SAP ERP.

I have mentioned our SAP Training methodology and Course Fees details for your reference;

  • SAP  Class Room Training:-
  • After completion of this configuration Training you will be getting 25% weight age on your profile.

    Course Duration

    42  hrs

    Timing

    Week Days: 2 hrs per day (OR) Weekends 3 hrs per day

    Method

    Class Room Training

    Breaks

    As Required, but limited to total of 5 min. in a day

    System Access

    60 days (from day-1 of the course.)

    SAP Functional Module:-

  • Material Management (MM)
  • Sales and Distribution (SD)
  • Finance and Controlling(FICO)
  • Human Resource Management(HRM)
  • Production and Planning(PP)
  • Plant Maintenance(PM)
  • Project System(PS)
  • Technical Module:-

  • ABAP
  • BASIS
  • SAP SECURITY
  • CRM Technical
  • BI/BO
  • HANA
  • II) SAP Real Time Project:-

    After completion of this real time project you will be getting 55% of exposure on your profile.

  • About the company                                                                 
  • Company profile
  • Company business process
  • Project kick off strategy
  •  

    2.1) Brief presentation on ERP and its benefits

    2.2) Brief presentation on SAP Modules and its implication

    2.3) Identification of Modules that suits business

    2.4) Brief presentation about ASAP methodology and its benefits

    2.5) Identification of core team member

  • Requirement gathering
  • 3.1) Identifying the existing business process AS IS Study

    3.2) AS IS document preparation

    3.3) Identifying the GAP

    3.4) Mapping the business process into SAP

  • Business blue print preparation
  • 4.1) Business blue print document preparation

    4.2) BBP Review with core team members

    4.3) Identifying RIEFCW

    4.3) BBP Sign off

  • Realization Phase
  • 5.1) Identifying the system landscape

    5.2) Configuring the business process in SAP

    5.3) Configuration document preparation

    5.4) Internal auditing

    5.5) Testing the configuration Unit testing

    5.6) Unit testing document preparation

    5.7) Unit testing sign off

    5.8) Integration testing

    5.9) Integration document preparation

    5.10) Integration document sign off
    5.11) Transporting the configuration to other clients

    5.12) External auditing

    5.13) User training document preparation

    5.14) User Trial & test

    5.15) User acceptance data preparation

    5.16) User acceptance test sign off

  • Final Preparation
  • 6.1) Identifying User roles & authorization

    6.2) Master data preparation

    6.3) Cut over activities

  • GO – live
  • 7.1) Uploading master data

    7.2) Initial uploading of stock

    7.3) Maintaining all open items in SAP

    7.4) Supporting day to day activities

    7.5) Month end activities by closing MM posting periods

    7.6) Excise utilization on every month end

    7.7) Year end activities training to core team members

    III) Professional Resume Preparation:- 1 Week!

    IV) 3 Levels of Technical Interview – 15 Days!

    Total Time Period: - (Configuration Training) 45 Days +

                                        (Real Time Project) 30 Days +

                                        (Profession Resume Preparation)  +

                                       (Technical Interview Preparation) 15 Days

    Total = 90 Days!

    Total Days to Complete SAP Course and Get Ready for SAP Job is required minimum of 90 Days!!

    Course Fees: 35,000 INR

    1. Level-1 Training

    1.1 SAP Class Room / Online Training – 45 Days!

    2. Level-2 Training

    2.1 SAP Real Time Project – 30 Days!

    3. Level-3 Training – 15 Days!

    3.1 Professional Resume Preparation

    3.2 3 Levels of Technical Interview

    3.3 SAP Remote Server Access from Home                      

    Contact Details:-

    Mail ID: Sapteam@atozsoft.co.in

    Mobile(Coimbatore)    : +91-99622-91197

    Mobile (Bangalore)     : +91-97427-77588

     

    COURSES

    Course Details

    Course

    SAP SUP Fiori Application Development, SAP Sybase Unwired Platform (SUP) for Developers, SAP Sybase Unwired Platform (SUP) for Administrators, SAP Sybase Afaria for Administrators, SAP Sybase Unwired Platform (SUP) for Architects, Sybase SQL Anywhere, SAP

    Other Information

    Course Fee: Not Mentioned

    Course Duration: Not Mentioned

    Placement Provided: No

    Course Details

    Course

    SAP Industry specific Module, SAP IS Utility, SAP IS Banking, SAP IS Oil, SAP IS Healthcare, SAP IS Retail, SAP IS Real Estate.

    Other Information

    Course Fee: Not Mentioned

    Course Duration: Not Mentioned

    Placement Provided: No

    Course Details

    Course

    SAP New Dimensional  Module, SAP CRM, SAP SRM, SAP SCM, SAP APO, SAP EWM Training in Bangalore, Coimbatore!

    Other Information

    Course Fee: Not Mentioned

    Course Duration: Not Mentioned

    Placement Provided: No

    Course Details

    Course

    SAP MM Module training in Bangalore : Call: +91-9742777588

     

    Dear SAP Trainee,

     

    We are a corporate consultant providing SAP Training to End User, Power User, Process Owner, Domain Expert and who ever wants to get a job in SAP ERP.

    I have mentioned our SAP MM Training methodology and Course Fees details for your reference;

     

  • SAP  Class Room Training:-
  •  

    After completion of this configuration Training you will be getting 25% weight age on your profile.

     

    Course Duration

    42  hrs

    Timing

    Week Days: 2 hrs per day (OR) Weekends 3 hrs per day

    Method

    Class Room Training

    Breaks

    As Required, but limited to total of 5 min. in a day

    System Access

    60 days (from day-1 of the course.)

     

    SAP Functional Module:-   Material Management (MM)

     

    MM Sub Module’s:-

     

  • Purchase (Procure2Pay Process with Vendor)
  • Inventory Management(Stock Maintenance, Physical Inventory)
  • Invoice Verification Process.
  • MM/SD/PP/FICO Integration
  • MRP (Material Requirement Planning)
  • CIN (Country India Version-Indian Taxation)
  •  

  • SAP Real Time Project:-  (30 Days)
  •  

    After completion of Level-1 Configuration Training we are arranging for Real Time Project, You need to go to the manufacturing sector and do the following Implementation process;

     

    After completion of this real time project you will be getting 55% of exposure on your profile.

     

    SAP suggests to go for ASAP Methodology which contain 5 phases;

     

     

     

  • About the company                                  
  •                                            

  • Company profile
  • Company business process
  •  

  • Project kick off strategy
  •  

    2.1) Brief presentation on ERP and its benefits

    2.2) Brief presentation on SAP Modules and its implication

    2.3) Identification of Modules that suits business

    2.4) Brief presentation about ASAP methodology and its benefits

    2.5) Identification of core team member

     

  • Requirement gathering
  •  

    3.1) Identifying the existing business process AS IS Study

    3.2) AS IS document preparation

    3.3) Identifying the GAP

    3.4) Mapping the business process into SAP

     

  • Business blue print preparation
  •  

    4.1) Business blue print document preparation

    4.2) BBP Review with core team members

    4.3) Identifying RIEFCW

    4.3) BBP Sign off

     

  • Realization Phase
  •  

    5.1) Identifying the system landscape

    5.2) Configuring the business process in SAP

    5.3) Configuration document preparation

    5.4) Internal auditing

    5.5) Testing the configuration Unit testing

    5.6) Unit testing document preparation

    5.7) Unit testing sign off

    5.8) Integration testing

    5.9) Integration document preparation

    5.10) Integration document sign off
    5.11) Transporting the configuration to other clients

    5.12) External auditing

    5.13) User training document preparation

    5.14) User Trial & test

    5.15) User acceptance data preparation

    5.16) User acceptance test sign off

     

  • Final Preparation
  •  

    6.1) Identifying User roles & authorization

    6.2) Master data preparation

    6.3) Cut over activities

     

  • GO – live
  •  

    7.1) Uploading master data

    7.2) Initial uploading of stock

    7.3) Maintaining all open items in SAP

    7.4) Supporting day to day activities

    7.5) Month end activities by closing MM posting periods

    7.6) Excise utilization on every month end

    7.7) Year end activities training to core team members

     

    Level-3 Training:- (18 Days)

     

    III) Professional Resume Preparation:- 3 Days!

     

    IV) 3 Levels of Technical Interview – 15 Days!

     

    Total Time Period: -  (Configuration Training) 42 Days +

                                        (Real Time Project) 30 Days +

                                        (Profession Resume Preparation) 3 Days +

                                       (Technical Interview Preparation) 15 Days

    Total = 90 Days!

     

    Total Days to Complete SAP Course and Get Ready for SAP Placement is required minimum of 90 Days!!

     

    Course Fees: 35,000 INR

     

    1. Level-1 Training:- 45 Days!

     

    1.1 SAP Class Room / Online Training.

    1.2 Assignment Completion -10 Topic

    1.3 Presentation Completion – 5 Topic

    1.4 Mini Project Training

    1.5 Integration with Cross Module

     

    2. Level-2 Training:- 30 Days!

     

    2.1 SAP Real Time Project – 30 Days!

    2.2 In plant Training

    2.3 AS IS Documentation

    2.4 TO BE Documentation

    2.5 Business Blue Print Documentation

    2.6 Configuration in DEV System

    2.7 Testing in Quality System

    2.8 Data Upload in Pre Production Server

    2.9 Go Live Activities in Production System.

     

  • Level-3 Training – 15 Days!
  • 3.1 Professional Resume Preparation

    3.2 Personal Round Interview

    3.2 Technical Interview 3 Levels

    3.3 HR Placement Activities.

     

    Other Information

    Course Fee: Not Mentioned

    Course Duration: Not Mentioned

    Placement Provided: No

    Course Details

    Course

    SAP SD Module Training in Bangalore Call:+91-9742777588

     

    Dear SAP Trainee,

     

    We are a corporate consultant providing SAP Training to End User, Power User, Process Owner, Domain Expert and who ever wants to get a job in SAP ERP.

    I have mentioned our SAP SD Training methodology and Course Fees details for your reference;

     

  • SAP  Class Room Training:-
  •  

    After completion of this configuration Training you will be getting 25% weight age on your profile.

     

    Course Duration

    42  hrs

    Timing

    Week Days: 2 hrs per day (OR) Weekends 3 hrs per day

    Method

    Class Room Training

    Breaks

    As Required, but limited to total of 5 min. in a day

    System Access

    60 days (from day-1 of the course.)

     

    SAP Functional Module:-   Sales and Distribution Module (SD)

     

    SD Sub Module’s:-

     

  • Sales Process (Order2Cash with Customer)
  • Pricing Procedure
  • MM/SD/PP/FICO Integration
  • CIN (Country India Version-Indian Taxation)
  •  

  • SAP Real Time Project:-  (30 Days)
  •  

    After completion of Level-1 Configuration Training we are arranging for Real Time Project, You need to go to the manufacturing sector and do the following Implementation process;

     

    After completion of this real time project you will be getting 55% of exposure on your profile.

     

    SAP suggests to go for ASAP Methodology which contain 5 phases;

     

     

     

  • About the company                                  
  •                                            

  • Company profile
  • Company business process
  •  

  • Project kick off strategy
  •  

    2.1) Brief presentation on ERP and its benefits

    2.2) Brief presentation on SAP Modules and its implication

    2.3) Identification of Modules that suits business

    2.4) Brief presentation about ASAP methodology and its benefits

    2.5) Identification of core team member

     

  • Requirement gathering
  •  

    3.1) Identifying the existing business process AS IS Study

    3.2) AS IS document preparation

    3.3) Identifying the GAP

    3.4) Mapping the business process into SAP

     

  • Business blue print preparation
  •  

    4.1) Business blue print document preparation

    4.2) BBP Review with core team members

    4.3) Identifying RIEFCW

    4.3) BBP Sign off

     

  • Realization Phase
  •  

    5.1) Identifying the system landscape

    5.2) Configuring the business process in SAP

    5.3) Configuration document preparation

    5.4) Internal auditing

    5.5) Testing the configuration Unit testing

    5.6) Unit testing document preparation

    5.7) Unit testing sign off

    5.8) Integration testing

    5.9) Integration document preparation

    5.10) Integration document sign off
    5.11) Transporting the configuration to other clients

    5.12) External auditing

    5.13) User training document preparation

    5.14) User Trial & test

    5.15) User acceptance data preparation

    5.16) User acceptance test sign off

     

  • Final Preparation
  •  

    6.1) Identifying User roles & authorization

    6.2) Master data preparation

    6.3) Cut over activities

     

  • GO – live
  •  

    7.1) Uploading master data

    7.2) Initial uploading of stock

    7.3) Maintaining all open items in SAP

    7.4) Supporting day to day activities

    7.5) Month end activities by closing MM posting periods

    7.6) Excise utilization on every month end

    7.7) Year end activities training to core team members

     

    Level-3 Training:- (18 Days)

     

    III) Professional Resume Preparation:- 3 Days!

     

    IV) 3 Levels of Technical Interview – 15 Days!

     

    Total Time Period: -  (Configuration Training) 42 Days +

                                        (Real Time Project) 30 Days +

                                        (Profession Resume Preparation) 3 Days +

                                       (Technical Interview Preparation) 15 Days

    Total = 90 Days!

     

    Total Days to Complete SAP Course and Get Ready for SAP Placement is required minimum of 90 Days!!

     

     

    Course Fees: 35,000 INR

     

    1. Level-1 Training:- 45 Days!

     

    1.1 SAP Class Room / Online Training.

    1.2 Assignment Completion -10 Topic

    1.3 Presentation Completion – 5 Topics

    1.4 Mini Project Training

    1.5 Integration with Cross Module

     

    2. Level-2 Training:- 30 Days!

     

    2.1 SAP Real Time Project – 30 Days!

    2.2 In plant Training

    2.3 AS IS Documentation

    2.4 TO BE Documentation

    2.5 Business Blue Print Documentation

    2.6 Configuration in DEV System

    2.7 Testing in Quality System

    2.8 Data Upload in Pre Production Server

    2.9 Go Live Activities in Production System.

     

  • Level-3 Training – 15 Days!
  • 3.1 Professional Resume Preparation

    3.2 Personal Round Interview

    3.2 Technical Interview 3 Levels

    3.3 HR Placement Activities.

     

    Other Information

    Course Fee: Not Mentioned

    Course Duration: Not Mentioned

    Placement Provided: No

    Course Details

    Course

    SAP ABAP Module Training in Bangalore (Call +91-9742777588)

     

    Dear SAP Trainee,

     

    We are a corporate consultant providing SAP Training to End User, Power User, Process Owner, Domain Expert and who ever wants to get a job in SAP ERP.

    I have mentioned our SAP ABAP Training methodology and Course Fees details for your reference;

     

  • SAP  Class Room Training:-
  •  

    After completion of this configuration Training you will be getting 25% weight age on your profile.

     

    Course Duration

    42  hrs

    Timing

    Week Days: 2 hrs per day (OR) Weekends 3 hrs per day

    Method

    Class Room Training

    Breaks

    As Required, but limited to total of 5 min. in a day

    System Access

    60 days (from day-1 of the course.)

     

    SAP Technical Module:-   Advanced Business Application Programming (ABAP)

     

    ABAP Sub Module’s:-

     

  • ABAP Dictionary
  • Reports
  • Dialog Programming
  • SAP Script
  • Smart Forms
  • Enhancement
  • Interfaces
  • Data Migration
  •  

     

  • SAP Real Time Project:-  (30 Days)
  •  

    After completion of Level-1 Configuration Training we are arranging for Real Time Project, You need to go to the manufacturing sector and do the following Implementation process;

     

    After completion of this real time project you will be getting 55% of exposure on your profile.

     

    SAP suggests to go for ASAP Methodology which contain 5 phases;

     

     

     

  • About the company                                  
  •                                            

  • Company profile
  • Company business process
  •  

  • Project kick off strategy
  •  

    2.1) Brief presentation on ERP and its benefits

    2.2) Brief presentation on SAP Modules and its implication

    2.3) Identification of Modules that suits business

    2.4) Brief presentation about ASAP methodology and its benefits

    2.5) Identification of core team member

     

  • Requirement gathering
  •  

    3.1) Identifying the existing business process AS IS Study

    3.2) AS IS document preparation

    3.3) Identifying the GAP

    3.4) Mapping the business process into SAP

     

  • Business blue print preparation
  •  

    4.1) Business blue print document preparation

    4.2) BBP Review with core team members

    4.3) Identifying RIEFCW

    4.3) BBP Sign off

     

  • Realization Phase
  •  

    5.1) Identifying the system landscape

    5.2) Configuring the business process in SAP

    5.3) Configuration document preparation

    5.4) Internal auditing

    5.5) Testing the configuration Unit testing

    5.6) Unit testing document preparation

    5.7) Unit testing sign off

    5.8) Integration testing

    5.9) Integration document preparation

    5.10) Integration document sign off
    5.11) Transporting the configuration to other clients

    5.12) External auditing

    5.13) User training document preparation

    5.14) User Trial & test

    5.15) User acceptance data preparation

    5.16) User acceptance test sign off

     

  • Final Preparation
  •  

    6.1) Identifying User roles & authorization

    6.2) Master data preparation

    6.3) Cut over activities

     

  • GO – live
  •  

    7.1) Uploading master data

    7.2) Initial uploading of stock

    7.3) Maintaining all open items in SAP

    7.4) Supporting day to day activities

    7.5) Month end activities by closing MM posting periods

    7.6) Excise utilization on every month end

    7.7) Year end activities training to core team members

     

    Level-3 Training:- (18 Days)

     

    III) Professional Resume Preparation:- 3 Days!

     

    IV) 3 Levels of Technical Interview – 15 Days!

     

    Total Time Period: -  (Configuration Training) 42 Days +

                                        (Real Time Project) 30 Days +

                                        (Profession Resume Preparation) 3 Days +

                                       (Technical Interview Preparation) 15 Days

    Total = 90 Days!

     

    Total Days to Complete SAP Course and Get Ready for SAP Placement is required minimum of 90 Days!!

     

     

    Course Fees: 35,000 INR

     

    1. Level-1 Training:- 45 Days!

     

    1.1 SAP Class Room / Online Training.

    1.2 Assignment Completion -10 Topic

    1.3 Presentation Completion – 5 Topic

    1.4 Mini Project Training

    1.5 Integration with Cross Module

     

    2. Level-2 Training:- 30 Days!

     

    2.1 SAP Real Time Project – 30 Days!

    2.2 In plant Training

    2.3 AS IS Documentation

    2.4 TO BE Documentation

    2.5 Business Blue Print Documentation

    2.6 Configuration in DEV System

    2.7 Testing in Quality System

    2.8 Data Upload in Pre Production Server

    2.9 Go Live Activities in Production System.

     

  • Level-3 Training – 15 Days!
  • 3.1 Professional Resume Preparation

    3.2 Personal Round Interview

    3.2 Technical Interview 3 Levels

    3.3 HR Placement Activities.

     

     

     

    Other Information

    Course Fee: Not Mentioned

    Course Duration: Not Mentioned

    Placement Provided: No

    Course Details

    Course

    SAP BASIS Module Training in Bangalore (Call +91-9742777588)

     

    Dear SAP Trainee,

     

    We are a corporate consultant providing SAP Training to End User, Power User, Process Owner, Domain Expert and who ever wants to get a job in SAP ERP.

    I have mentioned our SAP BASIS Training methodology and Course Fees details for your reference;

     

  • SAP  Class Room Training:-
  •  

    After completion of this configuration Training you will be getting 25% weight age on your profile.

     

    Course Duration

    42  hrs

    Timing

    Week Days: 2 hrs per day (OR) Weekends 3 hrs per day

    Method

    Class Room Training

    Breaks

    As Required, but limited to total of 5 min. in a day

    System Access

    60 days (from day-1 of the course.)

     

    SAP Technical Module:-   BASIS.

     

    BASIS Sub Module’s:-

     

  • R/3 Architecture
  • SAP Installation
  • User/Client Administrator
  • Transport Management Systems
  • Change and Transport System
  • Spool Administration
  • Patch and Kernel Administration
  • CCMS
  • Background Job Process.
  • OSS and SNOTE Concepts.
  • SAP Router
  • Database Management
  • Performance Tuning
  • System Monitoring
  • SAP Implementation Strategy
  • Connectivity bw R/3 and BI System.
  • SAP Netviewer.
  •  

     

  • SAP Real Time Project:-  (30 Days)
  •  

    After completion of Level-1 Configuration Training we are arranging for Real Time Project, You need to go to the manufacturing sector and do the following Implementation process;

     

    After completion of this real time project you will be getting 55% of exposure on your profile.

     

    SAP suggests to go for ASAP Methodology which contain 5 phases;

     

     

     

  • About the company                                  
  •                                            

  • Company profile
  • Company business process
  •  

  • Project kick off strategy
  •  

    2.1) Brief presentation on ERP and its benefits

    2.2) Brief presentation on SAP Modules and its implication

    2.3) Identification of Modules that suits business

    2.4) Brief presentation about ASAP methodology and its benefits

    2.5) Identification of core team member

     

  • Requirement gathering
  •  

    3.1) Identifying the existing business process AS IS Study

    3.2) AS IS document preparation

    3.3) Identifying the GAP

    3.4) Mapping the business process into SAP

     

  • Business blue print preparation
  •  

    4.1) Business blue print document preparation

    4.2) BBP Review with core team members

    4.3) Identifying RIEFCW

    4.3) BBP Sign off

     

  • Realization Phase
  •  

    5.1) Identifying the system landscape

    5.2) Configuring the business process in SAP

    5.3) Configuration document preparation

    5.4) Internal auditing

    5.5) Testing the configuration Unit testing

    5.6) Unit testing document preparation

    5.7) Unit testing sign off

    5.8) Integration testing

    5.9) Integration document preparation

    5.10) Integration document sign off
    5.11) Transporting the configuration to other clients

    5.12) External auditing

    5.13) User training document preparation

    5.14) User Trial & test

    5.15) User acceptance data preparation

    5.16) User acceptance test sign off

     

  • Final Preparation
  •  

    6.1) Identifying User roles & authorization

    6.2) Master data preparation

    6.3) Cut over activities

     

  • GO – live
  •  

    7.1) Uploading master data

    7.2) Initial uploading of stock

    7.3) Maintaining all open items in SAP

    7.4) Supporting day to day activities

    7.5) Month end activities by closing MM posting periods

    7.6) Excise utilization on every month end

    7.7) Year end activities training to core team members

     

    Level-3 Training:- (18 Days)

     

    III) Professional Resume Preparation:- 3 Days!

     

    IV) 3 Levels of Technical Interview – 15 Days!

     

    Total Time Period: -  (Configuration Training) 42 Days +

                                        (Real Time Project) 30 Days +

                                        (Profession Resume Preparation) 3 Days +

                                       (Technical Interview Preparation) 15 Days

    Total = 90 Days!

     

    Total Days to Complete SAP Course and Get Ready for SAP Placement is required minimum of 90 Days!!

     

     

    Course Fees: 35,000 INR

     

    1. Level-1 Training:- 45 Days!

     

    1.1 SAP Class Room / Online Training.

    1.2 Assignment Completion -10 Topic

    1.3 Presentation Completion – 5 Topic

    1.4 Mini Project Training

    1.5 Integration with Cross Module

     

    2. Level-2 Training:- 30 Days!

     

    2.1 SAP Real Time Project – 30 Days!

    2.2 In plant Training

    2.3 AS IS Documentation

    2.4 TO BE Documentation

    2.5 Business Blue Print Documentation

    2.6 Configuration in DEV System

    2.7 Testing in Quality System

    2.8 Data Upload in Pre Production Server

    2.9 Go Live Activities in Production System.

     

  • Level-3 Training – 15 Days!
  • 3.1 Professional Resume Preparation

    3.2 Personal Round Interview

    3.2 Technical Interview 3 Levels

    3.3 HR Placement Activities.

     

     

     

    Other Information

    Course Fee: Not Mentioned

    Course Duration: Not Mentioned

    Placement Provided: No

    Course Details

    Course

    SAP BO Module Training in Bangalore (Call +91-9742777588)

     

    Dear SAP Trainee,

     

    We are a corporate consultant providing SAP Training to End User, Power User, Process Owner, Domain Expert and who ever wants to get a job in SAP ERP.

    I have mentioned our SAP BO Training methodology and Course Fees details for your reference;

     

  • SAP  Class Room Training:-
  •  

    After completion of this configuration Training you will be getting 25% weight age on your profile.

     

    Course Duration

    42  hrs

    Timing

    Week Days: 2 hrs per day (OR) Weekends 3 hrs per day

    Method

    Class Room Training

    Breaks

    As Required, but limited to total of 5 min. in a day

    System Access

    60 days (from day-1 of the course.)

     

    Overview of  SAP BO Module:-

     

    • Understanding BusinessObjects Universes

    • Creating the Basic Universe

    • Building the Universe Structure

    • Dimension Objects

    • Measure Objects

    • Loops in a Universe

    • Understanding and Resolving SQL Traps

    • Applying Restrictions on Objects

    • Using @functions with Objects

    • Hierarchies

    • Lists of Values

    • Derived Tables and Indexes

    • Linking Universes

    • Universe Access Restrictions

    • Universe Management

    • Web Intelligence Intr-

    • Creating Web Intelligence Documents with Queries

    • Restricting Data Returned by a Query

    • Designing Web Intelligence Reports

    • Various features of WebI in Reports

    • Formatting Reports

    • Calculating Data with Formulas and Variables

    • Using Multiple Data Sources

    • Analyzing Data

    • Managing and Sharing Web Intelligence Documents

     

  • SAP Real Time Project:-  (30 Days)
  •  

    After completion of Level-1 Configuration Training we are arranging for Real Time Project, You need to go to the manufacturing sector and do the following Implementation process;

     

    After completion of this real time project you will be getting 55% of exposure on your profile.

     

    SAP suggests to go for ASAP Methodology which contain 5 phases;

     

     

     

  • About the company                                  
  •                                            

  • Company profile
  • Company business process
  •  

  • Project kick off strategy
  •  

    2.1) Brief presentation on ERP and its benefits

    2.2) Brief presentation on SAP Modules and its implication

    2.3) Identification of Modules that suits business

    2.4) Brief presentation about ASAP methodology and its benefits

    2.5) Identification of core team member

     

  • Requirement gathering
  •  

    3.1) Identifying the existing business process AS IS Study

    3.2) AS IS document preparation

    3.3) Identifying the GAP

    3.4) Mapping the business process into SAP

     

  • Business blue print preparation
  •  

    4.1) Business blue print document preparation

    4.2) BBP Review with core team members

    4.3) Identifying RIEFCW

    4.3) BBP Sign off

     

  • Realization Phase
  •  

    5.1) Identifying the system landscape

    5.2) Configuring the business process in SAP

    5.3) Configuration document preparation

    5.4) Internal auditing

    5.5) Testing the configuration Unit testing

    5.6) Unit testing document preparation

    5.7) Unit testing sign off

    5.8) Integration testing

    5.9) Integration document preparation

    5.10) Integration document sign off
    5.11) Transporting the configuration to other clients

    5.12) External auditing

    5.13) User training document preparation

    5.14) User Trial & test

    5.15) User acceptance data preparation

    5.16) User acceptance test sign off

     

  • Final Preparation
  •  

    6.1) Identifying User roles & authorization

    6.2) Master data preparation

    6.3) Cut over activities

     

  • GO – live
  •  

    7.1) Uploading master data

    7.2) Initial uploading of stock

    7.3) Maintaining all open items in SAP

    7.4) Supporting day to day activities

    7.5) Month end activities by closing MM posting periods

    7.6) Excise utilization on every month end

    7.7) Year end activities training to core team members

     

    Level-3 Training:- (18 Days)

     

    III) Professional Resume Preparation:- 3 Days!

     

    IV) 3 Levels of Technical Interview – 15 Days!

     

    Total Time Period: -  (Configuration Training) 42 Days +

                                        (Real Time Project) 30 Days +

                                        (Profession Resume Preparation) 3 Days +

                                       (Technical Interview Preparation) 15 Days

    Total = 90 Days!

     

    Total Days to Complete SAP Course and Get Ready for SAP Placement is required minimum of 90 Days!!

     

     

    Course Fees: 35,000 INR

     

    1. Level-1 Training:- 45 Days!

     

    1.1 SAP Class Room / Online Training.

    1.2 Assignment Completion -10 Topic

    1.3 Presentation Completion – 5 Topic

    1.4 Mini Project Training

    1.5 Integration with Cross Module

     

    2. Level-2 Training:- 30 Days!

     

    2.1 SAP Real Time Project – 30 Days!

    2.2 In plant Training

    2.3 AS IS Documentation

    2.4 TO BE Documentation

    2.5 Business Blue Print Documentation

    2.6 Configuration in DEV System

    2.7 Testing in Quality System

    2.8 Data Upload in Pre Production Server

    2.9 Go Live Activities in Production System.

     

  • Level-3 Training – 15 Days!
  • 3.1 Professional Resume Preparation

    3.2 Personal Round Interview

    3.2 Technical Interview 3 Levels

    3.3 HR Placement Activities.

     

     

    Other Information

    Course Fee: Not Mentioned

    Course Duration: Not Mentioned

    Placement Provided: No

    Course Details

    Course

    SAP Web GRC Module Training in Bangalore (Call +91-9742777588)

     

    Dear SAP Trainee,

     

    We are a corporate consultant providing SAP Training to End User, Power User, Process Owner, Domain Expert and who ever wants to get a job in SAP ERP.

    I have mentioned our SAP GRC Training methodology and Course Fees details for your reference;

     

  • SAP  Class Room Training:-
  •  

    After completion of this configuration Training you will be getting 25% weight age on your profile.

     

    Course Duration

    42  hrs

    Timing

    Week Days: 2 hrs per day (OR) Weekends 3 hrs per day

    Method

    Class Room Training

    Breaks

    As Required, but limited to total of 5 min. in a day

    System Access

    60 days (from day-1 of the course.)

     

    Overview of  SAP GRC Module:-

                                                                                                                                    

    Unit 1  – Installation, setup and upgrades

    Unit 2  – Understand the impact of Sarbanes-Oxley

    Unit 3  – Control access effectively

    Unit 4  – Color your company a greener shade of green

    Unit 5  – Source or sell goods internationally

    Unit 6  – Keep your employees safe and healthy

    Unit 7  – Ensure that data is kept secret and private

    Unit 8  – Use GRC as the basis for a powerful new corporate strategy

    Unit 9  – SAP GRC Access Control Overview and Product Component Tours

    Unit 10  – SAP GRC Access Control Pre-Installation Requirements

    Unit 11 – SAP GRC Access Control Installation

    Unit 12 – Virsa Compliance Calibrator Configuration

    Unit 13 – Virsa Firefighter for SAP Configuration

    Unit 14 – Virsa Access Enforcer Configuration

    Unit 15 – Virsa Role Expert Configuration

    Unit 16 – SAP security redesign

    Unit 17 – Project Management Office (PMO)

    Unit 18 – GRC Repository

     

  • SAP Real Time Project:-  (30 Days)
  •  

    After completion of Level-1 Configuration Training we are arranging for Real Time Project, You need to go to the manufacturing sector and do the following Implementation process;

     

    After completion of this real time project you will be getting 55% of exposure on your profile.

     

    SAP suggests to go for ASAP Methodology which contain 5 phases;

     

     

     

  • About the company                                  
  •                                            

  • Company profile
  • Company business process
  •  

  • Project kick off strategy
  •  

    2.1) Brief presentation on ERP and its benefits

    2.2) Brief presentation on SAP Modules and its implication

    2.3) Identification of Modules that suits business

    2.4) Brief presentation about ASAP methodology and its benefits

    2.5) Identification of core team member

     

  • Requirement gathering
  •  

    3.1) Identifying the existing business process AS IS Study

    3.2) AS IS document preparation

    3.3) Identifying the GAP

    3.4) Mapping the business process into SAP

     

  • Business blue print preparation
  •  

    4.1) Business blue print document preparation

    4.2) BBP Review with core team members

    4.3) Identifying RIEFCW

    4.3) BBP Sign off

     

  • Realization Phase
  •  

    5.1) Identifying the system landscape

    5.2) Configuring the business process in SAP

    5.3) Configuration document preparation

    5.4) Internal auditing

    5.5) Testing the configuration Unit testing

    5.6) Unit testing document preparation

    5.7) Unit testing sign off

    5.8) Integration testing

    5.9) Integration document preparation

    5.10) Integration document sign off
    5.11) Transporting the configuration to other clients

    5.12) External auditing

    5.13) User training document preparation

    5.14) User Trial & test

    5.15) User acceptance data preparation

    5.16) User acceptance test sign off

     

  • Final Preparation
  •  

    6.1) Identifying User roles & authorization

    6.2) Master data preparation

    6.3) Cut over activities

     

  • GO – live
  •  

    7.1) Uploading master data

    7.2) Initial uploading of stock

    7.3) Maintaining all open items in SAP

    7.4) Supporting day to day activities

    7.5) Month end activities by closing MM posting periods

    7.6) Excise utilization on every month end

    7.7) Year end activities training to core team members

     

    Level-3 Training:- (18 Days)

     

    III) Professional Resume Preparation:- 3 Days!

     

    IV) 3 Levels of Technical Interview – 15 Days!

     

    Total Time Period: -  (Configuration Training) 42 Days +

                                        (Real Time Project) 30 Days +

                                        (Profession Resume Preparation) 3 Days +

                                       (Technical Interview Preparation) 15 Days

    Total = 90 Days!

     

    Total Days to Complete SAP Course and Get Ready for SAP Placement is required minimum of 90 Days!!

     

     

    Course Fees: 35,000 INR

     

    1. Level-1 Training:- 45 Days!

     

    1.1 SAP Class Room / Online Training.

    1.2 Assignment Completion -10 Topic

    1.3 Presentation Completion – 5 Topic

    1.4 Mini Project Training

    1.5 Integration with Cross Module

     

    2. Level-2 Training:- 30 Days!

     

    2.1 SAP Real Time Project – 30 Days!

    2.2 In plant Training

    2.3 AS IS Documentation

    2.4 TO BE Documentation

    2.5 Business Blue Print Documentation

    2.6 Configuration in DEV System

    2.7 Testing in Quality System

    2.8 Data Upload in Pre Production Server

    2.9 Go Live Activities in Production System.

     

  • Level-3 Training – 15 Days!
  • 3.1 Professional Resume Preparation

    3.2 Personal Round Interview

    3.2 Technical Interview 3 Levels

    3.3 HR Placement Activities.

     

    Other Information

    Course Fee: Not Mentioned

    Course Duration: Not Mentioned

    Placement Provided: No

    Course Details

    Course

    SAP Online/Class Room Training in Bangalore (Call +91-9742777588)

     

    Dear SAP Trainee,

     

    We are a corporate consultant providing SAP Training to End User, Power User, Super User, Domain Expert and who ever wants to get a job in SAP ERP.

    I have mentioned our SAP Training methodology and Course Fees details for your reference;

     

     

  • SAP  Class Room Training:-
  •  

    After completion of this configuration Training you will be getting 25% weight age on your profile.

     

    Course Duration

    42  hrs

    Timing

    Week Days: 2 hrs per day (OR) Weekends 3 hrs per day

    Method

    Class Room Training

    Breaks

    As Required, but limited to total of 5 min. in a day

    System Access

    60 days (from day-1 of the course.)

     

    SAP Functional Module:-

     

  • Material Management (MM)
  • Sales and Distribution (SD)
  • Finance and Controlling(FICO)
  • Human Resource Management(HRM)
  • Production and Planning(PP)
  • Plant Maintenance(PM)
  • Project System(PS)
  •  

    Technical Module:-

     

  • ABAP
  • BASIS
  • SAP SECURITY
  • CRM Technical
  • BI/BO
  • HANA
  •  

    II) SAP Real Time Project:-

     

    After completion of this real time project you will be getting 55% of exposure on your profile.

     

  • About the company                                  
  •                                            

  • Company profile
  • Company business process
  •  

  • Project kick off strategy
  •  

    2.1) Brief presentation on ERP and its benefits

    2.2) Brief presentation on SAP Modules and its implication

    2.3) Identification of Modules that suits business

    2.4) Brief presentation about ASAP methodology and its benefits

    2.5) Identification of core team member

     

  • Requirement gathering
  •  

    3.1) Identifying the existing business process AS IS Study

    3.2) AS IS document preparation

    3.3) Identifying the GAP

    3.4) Mapping the business process into SAP

     

  • Business blue print preparation
  •  

    4.1) Business blue print document preparation

    4.2) BBP Review with core team members

    4.3) Identifying RIEFCW

    4.3) BBP Sign off

     

  • Realization Phase
  •  

    5.1) Identifying the system landscape

    5.2) Configuring the business process in SAP

    5.3) Configuration document preparation

    5.4) Internal auditing

    5.5) Testing the configuration Unit testing

    5.6) Unit testing document preparation

    5.7) Unit testing sign off

    5.8) Integration testing

    5.9) Integration document preparation

    5.10) Integration document sign off
    5.11) Transporting the configuration to other clients

    5.12) External auditing

    5.13) User training document preparation

    5.14) User Trial & test

    5.15) User acceptance data preparation

    5.16) User acceptance test sign off

     

  • Final Preparation
  •  

    6.1) Identifying User roles & authorization

    6.2) Master data preparation

    6.3) Cut over activities

     

  • GO – live
  •  

    7.1) Uploading master data

    7.2) Initial uploading of stock

    7.3) Maintaining all open items in SAP

    7.4) Supporting day to day activities

    7.5) Month end activities by closing MM posting periods

    7.6) Excise utilization on every month end

    7.7) Year end activities training to core team members

     

    III) Professional Resume Preparation:- 1 Week!

     

    IV) 3 Levels of Technical Interview – 15 Days!

     

    Total Time Period: - (Configuration Training) 45 Days +

                                        (Real Time Project) 30 Days +

                                        (Profession Resume Preparation)  +

                                       (Technical Interview Preparation) 15 Days

    Total = 90 Days!

     

    Total Days to Complete SAP Course and Get Ready for SAP Job is required minimum of 90 Days!!

     

    Course Fees: 35,000 INR

     

    1. Level-1 Training

    1.1 SAP Class Room / Online Training – 45 Days!

     

    2. Level-2 Training

    2.1 SAP Real Time Project – 30 Days!

     

    3. Level-3 Training – 15 Days!

    3.1 Professional Resume Preparation

    3.2 3 Levels of Technical Interview

    3.3 SAP Remote Server Access from Home                      

     

    Other Information

    Course Fee: Not Mentioned

    Course Duration: Not Mentioned

    Placement Provided: No

    Course Details

    Course

    SAP WM Module Training in Bangalore (Call +91-9742777588)

     

    Dear SAP Trainee,

     

    We are a corporate consultant providing SAP Training to End User, Power User, Process Owner, Domain Expert and who ever wants to get a job in SAP ERP.

    I have mentioned our SAP WM Training methodology and Course Fees details for your reference;

     

  • SAP  Class Room Training:-
  •  

    After completion of this configuration Training you will be getting 25% weight age on your profile.

     

    Course Duration

    42  hrs

    Timing

    Week Days: 2 hrs per day (OR) Weekends 3 hrs per day

    Method

    Class Room Training

    Breaks

    As Required, but limited to total of 5 min. in a day

    System Access

    60 days (from day-1 of the course.)

     

    Overview of  SAP WM Module:-

     

  • SAP WM Contents
  • Stock movements
  • Inventory management in WM
  • Ware house stock keeping
  • SAP WM Training Duration 
  • SAP WM Training Services
  •                                                                                                                        

  • SAP Real Time Project:-  (30 Days)
  •  

    After completion of Level-1 Configuration Training we are arranging for Real Time Project, You need to go to the manufacturing sector and do the following Implementation process;

     

    After completion of this real time project you will be getting 55% of exposure on your profile.

     

    SAP suggests to go for ASAP Methodology which contain 5 phases;

     

     

     

  • About the company                                  
  •                                            

  • Company profile
  • Company business process
  •  

  • Project kick off strategy
  •  

    2.1) Brief presentation on ERP and its benefits

    2.2) Brief presentation on SAP Modules and its implication

    2.3) Identification of Modules that suits business

    2.4) Brief presentation about ASAP methodology and its benefits

    2.5) Identification of core team member

     

  • Requirement gathering
  •  

    3.1) Identifying the existing business process AS IS Study

    3.2) AS IS document preparation

    3.3) Identifying the GAP

    3.4) Mapping the business process into SAP

     

  • Business blue print preparation
  •  

    4.1) Business blue print document preparation

    4.2) BBP Review with core team members

    4.3) Identifying RIEFCW

    4.3) BBP Sign off

     

  • Realization Phase
  •  

    5.1) Identifying the system landscape

    5.2) Configuring the business process in SAP

    5.3) Configuration document preparation

    5.4) Internal auditing

    5.5) Testing the configuration Unit testing

    5.6) Unit testing document preparation

    5.7) Unit testing sign off

    5.8) Integration testing

    5.9) Integration document preparation

    5.10) Integration document sign off
    5.11) Transporting the configuration to other clients

    5.12) External auditing

    5.13) User training document preparation

    5.14) User Trial & test

    5.15) User acceptance data preparation

    5.16) User acceptance test sign off

     

  • Final Preparation
  •  

    6.1) Identifying User roles & authorization

    6.2) Master data preparation

    6.3) Cut over activities

     

  • GO – live
  •  

    7.1) Uploading master data

    7.2) Initial uploading of stock

    7.3) Maintaining all open items in SAP

    7.4) Supporting day to day activities

    7.5) Month end activities by closing MM posting periods

    7.6) Excise utilization on every month end

    7.7) Year end activities training to core team members

     

    Level-3 Training:- (18 Days)

     

    III) Professional Resume Preparation:- 3 Days!

     

    IV) 3 Levels of Technical Interview – 15 Days!

     

    Total Time Period: -  (Configuration Training) 42 Days +

                                        (Real Time Project) 30 Days +

                                        (Profession Resume Preparation) 3 Days +

                                       (Technical Interview Preparation) 15 Days

    Total = 90 Days!

     

    Total Days to Complete SAP Course and Get Ready for SAP Placement is required minimum of 90 Days!!

     

     

    Course Fees: 35,000 INR

     

    1. Level-1 Training:- 45 Days!

     

    1.1 SAP Class Room / Online Training.

    1.2 Assignment Completion -10 Topic

    1.3 Presentation Completion – 5 Topic

    1.4 Mini Project Training

    1.5 Integration with Cross Module

     

    2. Level-2 Training:- 30 Days!

     

    2.1 SAP Real Time Project – 30 Days!

    2.2 In plant Training

    2.3 AS IS Documentation

    2.4 TO BE Documentation

    2.5 Business Blue Print Documentation

    2.6 Configuration in DEV System

    2.7 Testing in Quality System

    2.8 Data Upload in Pre Production Server

    2.9 Go Live Activities in Production System.

     

  • Level-3 Training – 15 Days!
  • 3.1 Professional Resume Preparation

    3.2 Personal Round Interview

    3.2 Technical Interview 3 Levels

    3.3 HR Placement Activities.

     

    Other Information

    Course Fee: Not Mentioned

    Course Duration: Not Mentioned

    Placement Provided: No

    Course Details

    Course

    SAP IS-Retail Module Training in Bangalore (Call +91-9742777588)

     

    Dear SAP Trainee,

     

    We are a corporate consultant providing SAP Training to End User, Power User, Process Owner, Domain Expert and who ever wants to get a job in SAP ERP.

    I have mentioned our SAP IS-Retail Training methodology and Course Fees details for your reference;

     

  • SAP  Class Room Training:-
  •  

    After completion of this configuration Training you will be getting 25% weight age on your profile.

     

    Course Duration

    42  hrs

    Timing

    Week Days: 2 hrs per day (OR) Weekends 3 hrs per day

    Method

    Class Room Training

    Breaks

    As Required, but limited to total of 5 min. in a day

    System Access

    60 days (from day-1 of the course.)

     

    Overview of  SAP IS-Retail Module:-

                                                                                                                                    

    I. Introduction

    II. Retail Master Data

    III. Site Master Data

    IV. Purchasing Data

    V. Assortment operations Listing & Management

    VI. Retail Pricing Retail Promotions

    VII. Merchandise Requirements Planning and purchasing, Distribution

    VIII. SALES ORDER MANAGEMENT

    IX. SAP Retail Store Connectivity

                                                                                                                      

  • SAP Real Time Project:-  (30 Days)
  •  

    After completion of Level-1 Configuration Training we are arranging for Real Time Project, You need to go to the manufacturing sector and do the following Implementation process;

     

    After completion of this real time project you will be getting 55% of exposure on your profile.

     

    SAP suggests to go for ASAP Methodology which contain 5 phases;

     

     

     

     

     

  • About the company                                  
  •                                            

  • Company profile
  • Company business process
  •  

  • Project kick off strategy
  •  

    2.1) Brief presentation on ERP and its benefits

    2.2) Brief presentation on SAP Modules and its implication

    2.3) Identification of Modules that suits business

    2.4) Brief presentation about ASAP methodology and its benefits

    2.5) Identification of core team member

     

  • Requirement gathering
  •  

    3.1) Identifying the existing business process AS IS Study

    3.2) AS IS document preparation

    3.3) Identifying the GAP

    3.4) Mapping the business process into SAP

     

  • Business blue print preparation
  •  

    4.1) Business blue print document preparation

    4.2) BBP Review with core team members

    4.3) Identifying RIEFCW

    4.3) BBP Sign off

     

  • Realization Phase
  •  

    5.1) Identifying the system landscape

    5.2) Configuring the business process in SAP

    5.3) Configuration document preparation

    5.4) Internal auditing

    5.5) Testing the configuration Unit testing

    5.6) Unit testing document preparation

    5.7) Unit testing sign off

    5.8) Integration testing

    5.9) Integration document preparation

    5.10) Integration document sign off
    5.11) Transporting the configuration to other clients

    5.12) External auditing

    5.13) User training document preparation

    5.14) User Trial & test

    5.15) User acceptance data preparation

    5.16) User acceptance test sign off

     

  • Final Preparation
  •  

    6.1) Identifying User roles & authorization

    6.2) Master data preparation

    6.3) Cut over activities

     

  • GO – live
  •  

    7.1) Uploading master data

    7.2) Initial uploading of stock

    7.3) Maintaining all open items in SAP

    7.4) Supporting day to day activities

    7.5) Month end activities by closing MM posting periods

    7.6) Excise utilization on every month end

    7.7) Year end activities training to core team members

     

    Level-3 Training:- (18 Days)

     

    III) Professional Resume Preparation:- 3 Days!

     

    IV) 3 Levels of Technical Interview – 15 Days!

     

    Total Time Period: -  (Configuration Training) 42 Days +

                                        (Real Time Project) 30 Days +

                                        (Profession Resume Preparation) 3 Days +

                                       (Technical Interview Preparation) 15 Days

    Total = 90 Days!

     

    Total Days to Complete SAP Course and Get Ready for SAP Placement is required minimum of 90 Days!!

     

     

    Course Fees: 35,000 INR

     

    1. Level-1 Training:- 45 Days!

     

    1.1 SAP Class Room / Online Training.

    1.2 Assignment Completion -10 Topic

    1.3 Presentation Completion – 5 Topic

    1.4 Mini Project Training

    1.5 Integration with Cross Module

     

    2. Level-2 Training:- 30 Days!

     

    2.1 SAP Real Time Project – 30 Days!

    2.2 In plant Training

    2.3 AS IS Documentation

    2.4 TO BE Documentation

    2.5 Business Blue Print Documentation

    2.6 Configuration in DEV System

    2.7 Testing in Quality System

    2.8 Data Upload in Pre Production Server

    2.9 Go Live Activities in Production System.

     

  • Level-3 Training – 15 Days!
  • 3.1 Professional Resume Preparation

    3.2 Personal Round Interview

    3.2 Technical Interview 3 Levels

    3.3 HR Placement Activities.

     

    Other Information

    Course Fee: Not Mentioned

    Course Duration: Not Mentioned

    Placement Provided: No

    COMMENTS
    • Date 28th Sep 2017 Say's

      HI,

      This is veera lakshm,i iam staying in marthahalli marthahalli to indiranagar it is very far 

       

    • Date 28th Sep 2017 Say's

      i am looking for job 

       

    ×