Inspection Lot at 103 movement
Can movement type 103 ( receive to GR block) create inspection lot ?
Is result recording possible for this lot?
Yes it is possible. In customising, you will have to setup QM active for mvmt type -103 under applicable scenarios(for PO normal stock type, others like Sub contract etc as applicable).
Set up the Material Master -QM view for the inspn type (default 01).
Related: Movement Types in SAP MM Inventory Management
In default setting for MIGO Change mvmt type for GR from 101 to 103 & adopt. Then do MIGO for the material.
System creates lot with stock in GR Blocked.Prior to UD, you can display in the inspection lot stock tab, the indicator GR to blocked stock.Also can confirm same in MMBE under GR blocked stock.
Do QE01 & QA11 as per normal.
Inspection during Stock Transfer
We are doing stock transfer between 2 plants within the same company code. Followed by delivery and excise invoice. While doing GR at the second plant inspection lot is not getting created. We have maintained 01 inspection type in the material master for the recipient plant and also the relevant inspection plan.
01 inspection type is for goods receipt against a purchase order. You can assign stock transfer inspection type (08 ) or check out the movement type for this GR and activate QM for that movement type in customizing and use inspection type 05, i.e. miscellaneous GR.
I tried with both 05 and 08- its not worrking
Checked for the mvt type too- its 101
There are several combinations "under" one movement type. In case of MVT101 you can have inspection types 01, 04 and 08. Check the exact combination (with MM people if necessary) you are using and then check in IMG what the correct lot origin is and that QM is not deactivated for it.
As told, if inspection setup 08 is maintained in receiving plant then stock comes in quality.
Only appropriate config for insp type needs to be done.