PP (Production Planning) Tutorial
- SAP BOM Tcode (Transaction codes)
Bill of material (BOM) A list of all of the items that make up a product or assembly. The list is complete for its given purpose, has a formal str ...
- Difference between Goods Issue and Goods Receipt
Goods Issue Vs. Goods Receipt Goods Receipts and Goods Issue both deal with the inventory only. Goods Issue in SAP A Goods Issue is defined a ...
- Difference between By-Product and Co-Product
By-Product vs Co-Product in SAP BOM Main difference between By-product and Co-product In the case of Co-product costs are settled with an appor ...
- SAP PP (Production Planning) Certification Cost and Course Duration in India
Numerous reputed institutes located across the world are now imparting SAP PP training to interested candidates in the entry and advanced levels of th ...
- Backflushing in SAP PP
Answered
If you want your auto goods receipt or good issues that will further result in saving in the manual interference and in so doing the cost using an ins ...
- Production Planning Transaction Codes
Transaction Activity Master Data MD25 Create planning calendar MD26 Change planning calendar MD27 Display planning calendar MDSA Displa ...
- SAP PP Process Flow
The PP flow consists of planning and execution as described. Here is the flow of PP in simple language: First of all demand is generate ...
- Routing and Work Centers in SAP PP
For SAP PP consultants, it is very important to understand the concept of SAP workcenters as well as routings in SAP. What is Routing in SAP PP? ...
- KANBAN Processes, Procedure and Prerequisites with MRP
Prerequisites In this process, the storage location assigned to the supply area is not excluded from MRP.If a material is planned and procu ...
- SAP KANBAN and Implementation Considerations
What is SAP KANBAN? For those of us who are not aware what the term, "Kanban" refers to, this is a process which is related to monitoring ...
- Job Profile & Salary Package for SAP PP (Production Planning) Consultant
Still this sector needs good number of Indian professionals. Currently 7 out of 10,000 of all Indian professionals are having expertise in SAP PP. The ...
- SAP Production Order Variance Report
Check out some of the reporting available through Controlling => Product Cost Controlling => Cost Object Controlling => Product Cost by Order ...
- Calculation to determine the delivery date and release date
There have been three parameters that SAP will take it into calculation to determine the delivery date and release date during material requirement pl ...
- SAP Factory Calendar in Plant
What is SAP Factory Calendar? Factory calendar contain company specific dates such as alternate working Saturdays, Plant shutdown etc. You can c ...
- IMPORTANT TCODES FOR KANBAN
Create Supply Area (Tcode: PK05) Create Control Cycle (Tcode: PKMC) Kanban Transaction through Scanning or Manual operation. ...
- How to delete the assignment on handling units
Hi i want to delete the assignment on handling units to work order from 08 to 12 status You can change the assignment from the notifications and or ...
- Difference between MRP type PD and MPS type M0
SAP MPS vs MRP TypeWhen running MRP using transaction MD02 and MD41, what the difference should be?There is no difference in the processing logic as s ...
- Qualifications and Skills requires to become a SAP PP (Production Planning) Consultant
Thus the basic skills required are: Good educational background, with a degree from reputed institute or university Basic knowledge ...
- Impact of NETCH, NETPL, NETUL on MRP
Procurement type does not affect MRP processing key, During regenerative planning, all materials are planned for a plant. This makes sense when you ...
- Cutover Activities followed for PP Module?
I am listing some cut over activities to be followed (for PP - Discrete Manufacturing). Production Planning / Master data: For Productio ...
- Capacity planning CM01
Capacity planning CM01 - When you run capacity planning T-code: CM01, you found the plan orders are not included in the pegged requirement,you checked ...
- Equipment and Tools Management Configuration Documentation
Equipment and Tools management: Configuration Guide1. PurposeThe purpose of this configuration is to provide the information on the configuration of E ...
- Questions on MRP Group and MRP Controller
MRP groups are used when the plant division for planning is not enough for the division of the different materials MRP requirements. You assign differ ...
- Explode BOM
Transaction code : CS11 to explode BOM level by level CS12 to explode BOM Multi level Material : Your Material code Plant : You ...
- Steps for Subcontracting
Like to share with you my Subcontracting Steps: 1. Define all the materials in your plant (subcontracting and packaging etc). 2. In the mate ...
- MRP Monthly lot size
Appreciated if some guide can be provided. MRP lot size has been set to MB (Monthly lot size) It is known that with this setting, material ar ...
- Difference between MRP type manual reorder point and automatic reorder
In manual reorder point, you must define the reorder point (and eventually the safety stock) according to your criteria. For automatic, these valu ...
- Material Allocations Remain in MAPL after Routing
We have noticed that materials assigned to a routing remain in table MAPL linked to the deleted routing. Shouldn't the records in MAPL be deleted when ...
- When do we use planning without final assembly strategy?
We have mainly MTS, MTO, planning with final assembly and planning without final assembly. Now when we are dealing with planning with final assembly, ...
- What current settings required for print of production order.
You can only make Customizing settings in the production client in transactions which are marked as 'Current settings'. Start Transactio ...